• sa.Gov Home
  • Business
    • City Bidding & Contracting Opportunities
    • City Contract Management System
    • Development Services
    • Economic Development
    • Incentive Scorecard System
    • International Affairs Film San Antonio
    • SA eProcurement System (SAePS)
  • City Services
  • Departments
  • Government
    • Boards & Commission Agendas
    • City Council Agenda
    • Council Committee Agendas
    • City Holidays
    • City Officials
    • Municipal Courts
    • Office of the City Clerk
    • Other Public Agencies
  • Recreation
    • Alamodome
    • Art & Culture
    • Convention Facilities
    • Golf
    • Library
    • Parks & Recreation
    • San Antonio International Airport
    • San Antonio Bikes
  • Residents
    • Animal Care Services
    • Code Compliance
    • Community Initiatives
    • Fire
    • Health Services
    • Housing & Neighborhood Services
    • Maps
    • Planning & Development Services
    • Police
    • Public Works
    • Solid Waste Management
  • Visitors
parksandrec and Recreation Department
Site Map  |  
 
Home Home E-Mail LinkShare this page with a friend Print Print this page
 
• About Us
• Activity Guide
• Community Services
• Contact Us
• Employment
• FAQs
• Historic City Cemeteries
• In the News
• Metal Detecting
• Park Directory
• Parks & Recreation Board
• Park Safety & Rules
• Project Updates
• Recycling Initiative
• Related Links
• Ron Darner Headquarters
• San Jose Burial Park
• Stage Rentals
• Tree Planting Initiative
• Telephone Directory
• Volunteer Services
• Wi-Fi Services
• Events Calendar
• Park Directory
• Reserve a Facility
• Community Link Centers
• Greenway Trails
• Fishing
• Park Directory
• Park Safety & Rules
• Park Trails
• Natural Areas & Gardens
• Activity Guide
• Adapted Sports
• Boxing
• Community Centers
• Dance
• Disc Golf
• Dog parks
• Fishing
• Fitness Centers
• Fitness in the Park
• Fitness Stations
• Golf
• Music
• Our Part of Town Talent Shows
• Paddling
• Seniors
• Skate parks
• Softball
• Summer Youth Programs
• Summer Food Program
• Sunken Garden Theater
• Swimming
• Tennis
• Youth Sports
• Fitness in the Park
• Fitness Calendar of Classes
• FIP Instructor Application
• Fitness Resources
• Fit Pass SA Program
• Calendar of Events

Calendar

parks logo

Twitter Facebook

Park Directory

Rules | Alcohol | Safety & Police | Reservations

Tobin Park (John) Park

General Info

Address: 1900 W. Martin, 78207
Phone: 207-7275
Website: Community Link Center
Hours: Sunday-Saturday: 5 a.m. – 11 p.m.
Size: 1 acre
Amenities: Community Center (rentable)
Basketball Court (first-come, first-serve)
Fees: Community Center rental fees:
Gym practices and/or games:
$25 per hour flat fee with two-hour minimum. This gym is not available for volleyball rentals

General use entire facility:
$50 an hour with a two-hour minimum plus $100 deposit.

Special events charging admission and/or selling concessions:
$75 an hour with a two-hour minimum and $100 deposit.

Security
Security is required for any event with a DJ or band. hour minimum plus $100 deposit.

Special events charging admission and/or selling concessions:
$75 an hour with a two-hour minimum and $100 deposit.

Other equipment:
Approximately 17 tables, three card tables and 103 chairs are available with the rental. Call 225-0941 to confirm the number of tables and chairs available for your rental.
Notes: Alcohol prohibited

Availability:

Community Center


Park History

John Tobin Community Center was originally constructed in 1957. The first building was designed by the architectural firm of Jones and Grobe and built by Walter E. Bowden at a cost of $14,643.

In December 1957, City Council formally named the new recreation building the John Tobin Youth Center. According to Council minutes, the name was one of several suggested by school children in the vicinity. A committee of City officials appointed to review the names chose to name the facility for Mr. Tobin who served as San Antonio’s mayor from June 1923 until his death in November 1927.

John Tobin was a descendant of San Antonio’s original Canary Island settlers. His grandfather, John W. Smith, fought in the Texas revolution, was the city’s first mayor under the Republic of Texas, and served in the first Texas congress. John Tobin first served as Bexar County sheriff for 21 years. He was then elected mayor shortly after the devastating 1921 flood and therefore understood the importance of flood control. Tobin was instrumental in building the Olmos Dam and widening Martinez and Alazan Creeks.

Under his administration, the City greatly expanded its parks and recreation system and also built the Municipal Auditorium.

The center’s location on Alazan Creek and its importance as a recreation facility are fitting tributes to Tobin’s work. Thirty years after it was constructed, the City Council approved a contract to enlarge and renovate Tobin Recreation Center. Under the direction of architect Paul Garcia, $367,000 was invested in improvements to the center. It was rededicated on November 17, 1979.

Numerous additional improvements to Tobin were made in 1999 and 2000. The first was a multi-use addition that allows additional programming and activities at the center. This $200,000 park bond-funded project also included accessibility improvements in the rest rooms, interior renovation, a kiln room, drinking fountain and concrete walkways. The consultant for the project was Louis Cruz Associates and the contractor was LVA Construction Co.

An additional $85,000 in improvements were made by Parks and Recreation Department Park Operations Division staff. These included replacement and installation of new bay light fixtures and scoreboards in the gym; lighting in the kitchen, game room, hallway and rest rooms by departmental electricians. New security lighting was also installed outside the building. Carpenters installed new drop ceilings in the game room, kitchen, office and rest rooms. They also built shelves for the kiln room, storage rooms and in the new addition. They replaced floor tiles throughout the building and installed exhaust fans in the rest rooms. Park Operations masons poured new walkways to the front and back entrances of the center and sealed off the old air conditioning vents throughout the building's interior walls. They also assisted HVAC crews in modifying duct installation in the rear door over head. The HVAC crews installed new units and ducts throughout the entire building and gym. Painters painted the center's interior and exterior walls. Plumbers made minor repairs to existing fixtures in the rest rooms. The new improvements were dedicated on May 15, 2000.

<<BACK

Copyright © 2011 City of San Antonio

ADA Compliance | Telecommuting | Site Map | Public Information/Open Records | Privacy Policy and Disclaimer