Broadway-Hildebrand Archive

Office

  • Physical Address
  • Municipal Plaza Building
    114 W. Commerce, 6th Floor
    San Antonio, TX 78205   
  • Mailing Address
  • P.O. Box 839966
    San Antonio, TX 78283-3966
  • Phone
  • 210.207.8022

Staff

  • Razi Hosseini, P.E.
    Director/City Engineer
  • Anthony Chukwudolue, P.E.
    Deputy Director
  • Christie Chapman
    Assistant Director
  • Nefi Garza, P.E.
    Assistant Director
  • Luis Maltos, P.E.
    Interim Assistant Director
  • Paul Berry
    Chief Communications Officer

December 24, 2012:

No work is expected to be completed during December 22, 2012 through January 1, 2013. Traffic Signal work at Broadway St. and Allensworth will resume on January 2, 2013 and will continue through January 4, 2013. The traffic signal work will be completed during the hours of 9:00am to 4:00pm daily with alternating lane closures. SAPD will be on site to assist with closures. Please contact John Donnelly at 207-4019 if you have any questions.

December 17, 2012:

This is to announce the start of construction on the Broadway Corridor PH III project. The contractor will work on the traffic signal at Allensworth from today Dec 18 to Friday Dec 21. The work will resume on Jan 2, 2013. All of the traffic signal work will be done during the hours of 7:00 to 6:00 daily. There will be lane closures of the right lane to on both north and south bound traffic to accomplish the required work. If you have questions please call John Donnelly at 207-4019.

January

Broadway

Beginning Thursday 1-17-13 the south bound right lane will be closed between Katherine St. and Hildebrand Ave. for AT&T work.

The following work is expected to be completed the week of January 7, 2013:

Broadway:

Striping for the newly installed signal at Allensworth and Broadway will occur Monday January 7 through Wednesday January 9, weather permitting.

Mobile lane closures (short duration) will be required for the work described above. SAPD will be on site.

Hildebrand:

Preliminary work for the sanitary sewer main crossing Hildebrand, (Phase 2) which includes field verification of existing utilities will begin on Monday January 7 through Wednesday January 9, weather permitting. This preliminary work will require alternating lane closures. SAPD will be on site.

The installation of the sanitary sewer main crossing will begin on Friday, January 11, 2013 at 9:00PM and end on Monday, January 14, 2013 at 5:00am. This work will require the FULL closure of Hildebrand through the weekend. View the detour routes related to this closure. The Hildebrand weekend closure will affect VIA routes 509, 8 and 7.

January 15, 2013:

Broadway Website - Lane Closures:

** Hildebrand Ave. will be one-way eastbound from approximately the San Antonio River to New Braunfels Ave. beginning Monday January 14 at 5:00am **

Monday January 14- Sunday January 20:
Hildebrand:

  • Phase 4: Install CPS gas facilities between San Antonio River to Broadway St.
  • Asphalt repairs around the bridge for the San Antonio River

Please contact John Donnelly at 207-4019 if you have any questions.


February

View the detour routes for the Feb 22 - Feb 25 Broadway Closures

Work Schedule: February 18- Sunday February 24:

Monday February 18, 2013- Saturday February 23, 2013:

Hildebrand between San Antonio River and Broadway St.
  • Continue construction of SAWS water line facilities to include night time operations
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway between Hildebrand and Burr
  • Continue construction of CPS gas facilities
Broadway between Burr and Katherine
  • AT&T will close the two outside southbound lanes for work on their underground facilities

Sunday February 24, 2013:

  • Continue construction of CPS gas facilities on Burr and Hildebrand

Lane Closures:

Thursday February 21, 2013-Friday February 22, 2013:

Broadway at Burr

  • Between 9PM and 5AM northbound Broadway will be limited to one lane

Friday February 22, 2013 -Sunday February 24, 2013:

Broadway at Hildebrand Intersection

  • Broadway will be closed to northbound and southbound traffic. Detours will be placed
  • Hildebrand eastbound will remain open

***Between 9AM to 4PM and 8PM to 5AM Monday-Friday Hildebrand will be reduced to one travel lane***


Monday February 11, 2013- Saturday February 16, 2013:

  • Hildebrand between San Antonio River and Broadway St. (approximately 4 weeks) ◦Complete construction of CPS gas facilities
    • Begin construction of SAWS water line facilities to include night time operations
    • Begin construction of CPSelectrical/telecommunication duct bank facilities to include night time operations
  • Broadway between Hildebrand and Burr (approximately 6 weeks)◦Begin construction of CPS gas facilities
    • Broadway between Burr and Katherine
    • AT&T will close the two outside southbound lanes for work on their underground facilities

Beginning Friday night February 8, 2012 the following change in lane closures will begin:

Hildebrand between SA River to Broadway:
  • The two northern (UIW side) lanes will be closed for construction
  • The two southern (AT&T side) lanes will remain open for traffic
  • Construction will consist of installation of water main facilities and electrical/telecom duct facilities
Broadway between Hildebrand to Burr:
  • The 3 center lanes will be closed for construction.
  • Two lanes will remain open for traffic in the southbound direction and two lanes will remain open for traffic in the north bound direction
  • Construction will consist of installation of gas main facilities

***Between 9AM to 4PM Monday-Friday the left lane (north side of Hildebrand/closest to the University of Incarnate Word) will be closed***


Work Week: February 4- Sunday February 10:

Monday February 4, 2013- Friday February 8, 2013:

  • Hildebrand between San Antonio River and Broadway St.
    • Continue construction of the CPS gas facilities
  • Broadway between Thorman Pl. and Harrigan Ct.
    • AT&T will be working within the south bound right lane

Friday Night February 8, 2013:

  • Hildebrand between San Antonio River and Broadway St.
    • Set up traffic control for water and underground electric work

Saturday February 9, 2013:

  • Hildebrand between San Antonio River and Broadway St.
    • Begin work on water and underground electric
  • Broadway between Hildebrand Ave. and Burr Rd.
    • Set up traffic control for gas line work to include night operations

Sunday February 10, 2013:

  • No work scheduled

***Between 9AM to 4PM Monday-Friday the left lane (north side of Hildebrand/closest to the University of Incarnate Word) will be closed***

March

Work Schedule: February 25- Sunday March 3:

Monday February 25, 2013- Saturday March 2, 2013:

Hildebrand between San Antonio River and Broadway St.
  • The two northern lanes (closest to University of Incarnate Word) will be closed
  • Continue construction of SAWS water line facilities
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway between Perry Ct and Burr Rd
  • The eastern lane (closest to Bill Miller's) will be closed
  • Burr Rd. at Broadway will be closed
  • Continue construction of CPS gas facilities
Broadway between Burr and Katherine
  • AT&T will close the two outside southbound lanes for work on their underground facilities

Sunday March 3, 2013:

  • No work Scheduled

***Between 9AM to 4PM and 8PM to 5AM Monday-Friday Hildebrand will be reduced to one travel lane***


Work Schedule: March 11, 2013 through March 17, 2013:

Monday 3-11-13 to Saturday 3-16-13:

Hildebrand between San Antonio River and Broadway St.
  • The two northern lanes (closest to University of Incarnate Word) will remain closed
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway at Burr Rd.
  • Burr Rd. at Broadway will remain closed
  • Alamo Heights will be replacing their water line
Broadway from Allensworth to Hildebrand & from Burr Rd. to Katherine Ct.
  • AT&T will continue working on their underground facilities

Friday 3-15-13:

Broadway from Hildebrand to Perry Ct.:
  • Close the southbound lane closest to The University of the Incarnate Word
  • Begin construction of CPS electrical/telecommunication duct bank facilities

Sunday 3-17-13:

  • No work Scheduled

***Between 9AM to 4PM and 8PM to 5AM Monday-Friday Hildebrand will be reduced to one travel lane***


Work Schedule: March 18, 2013 through March 24, 2013:

Monday March 18, 2013 - Saturday March 24, 2013

Hildebrand Ave. between the San Antonio River and Broadway St.:
  • The two northern lanes (closest to University of the Incarnate Word) will remain closed
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway St. between Hildebrand Ave. and Burr Rd.:
  • The western most southbound lane (closest to University of the Incarnate Word) will be closed
  • Begin construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway St. between Hildebrand Ave. and Allensworth:
  • The western most southbound lane (closest to AT&T) will be closed
  • AT&T will continue working on their underground facilities to include night time operations

Sunday 3-24-13:

  • No work scheduled

***Between 6PM to 6AM Monday-Friday Hildebrand will be reduced to one travel lane***


Monday March 25, 2013 - Saturday March 30, 2013

Hildebrand Ave. between the San Antonio River and Broadway St.:
  • The two northern lanes (closest to University of the Incarnate Word) will remain closed

  • AT&T will begin working on their underground facilities
Broadway St. between Hildebrand Ave. and Burr Rd.:
  • The western most southbound lane (closest to University of the Incarnate Word) will be closed
  • Two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Broadway St. and Burr Rd.:
  • Alamo Heights Public Works will close the eastern most northbound lane (approximately between Bill Miller’s and the University of the Incarnate Word Enrollment Center) and the northern half of Burr Rd. at the Broadway St. intersection for the replacement of a water main

Sunday 3-31-13:

  • No work scheduled

***Between 9AM to 5AM Monday-Friday Hildebrand will be reduced to one travel lane***


April

Special Notice: Siclovia Event

**On Sunday April 7, 2013 Broadway St. between 4th St and Mulberry will be closed for the Siclovia event.
  • During this event, Hwy 281 can be accessed through Mulberry (south of Hildebrand) or Basse (north of Hildebrand)
  • For additional information on Siclovia and a full description of ALL street closures please visit www.ymcasatx.org/siclovia

Special Alert: Additional Northbound Lane Closures

**This closures are in addition to the on going closures on Hildebrand from SA River to Broadway and on Broadway from Hildebrand to Burr**

Beginning Saturday night April 6, 2013 the following additional northbound lane closures will begin:

Broadway St. between Groveland Pl and Hildebrand:

  • The eastern side of Broadway (closest to the Broadway Condos) will be closed
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Construction will consist of installation CPS electrical/telecom duct facilities

Hildebrand between Broadway and New Braunfels:

  • The southern side of Hildebrand (closest to the Broadway Condos) will be closed
  • Traffic will be shifted north
  • Construction will consist of installation of CPS electrical/telecom duct facilities
Monday April 8, 2013- Saturday April 13 2013:

Hildebrand Ave. between San Antonio River and Broadway St.

  • The two northern lanes (closest to University of the Incarnate Word) will be closed
  • AT&T will begin working on their underground facilities

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be closed
  • Traffic will be shifted to the north side
  • Begin construction of CPS electrical/telecommunication duct bank facilities to include night time operations
  • On Tuesday 4/9 and Wednesday 4/10, during night time hours, Grande Communications will be working on their overhead facilities within the same work area described above

Broadway between Hildebrand Ave. and Burr Rd

  • The two western lanes (closest to University of the Incarnate Word) will be closed
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Broadway between Groveland Pl. and Hildebrand Ave.

  • The eastern side of Broadway (closest to the Broadway Condos) will be closed
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Begin construction of CPS electrical/telecommunication duct bank facilities to include night time operations
  • On Tuesday 4/9 and Wednesday 4/10, during night time hours, Grande Communications will be working on their overhead facilities within the same work area described above
Monday April 8 - Tuesday April 9, 2013:

Broadway St. and Burr Rd.

  • Between 9AM and 8PM Alamo Heights Public Works will close the eastern most northbound lane (approximately between Bill Millers and University of the Incarnate Word Enrollment Center) and all of Burr Rd. at the Broadway St. intersection for the completion of the water main installation
  • This work was originally scheduled to be completed the week prior, however due to rain this work was delayed
Sunday April 14, 2013:
  • No work scheduled

***Between 9AM to 5AM Monday-Friday Hildebrand will be reduced to one travel lane***

Monday April 15, 2013- Saturday April 20, 2013:

Hildebrand Ave. between San Antonio River and Broadway St.

  • The two northern lanes (closest to University of the Incarnate Word) will be closed
  • AT&T will begin working on their underground facilities during nighttime operations

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be closed
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Broadway between Hildebrand Ave. and Burr Rd

  • The two western lanes (closest to University of the Incarnate Word) will be closed
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities to include night time operations
  • Weather permitting, this work is anticipated to be completed on Friday April 19; traffic control will be removed in this area and traffic will be shifted west to the pre-existing condition

Broadway between Groveland Pl. and Hildebrand Ave.

  • The eastern side of Broadway (closest to the Broadway Condos) will be closed
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Sunday April 21, 2013:
  • No work scheduled
Monday April 29, 2013- Saturday May 4, 2013:

Hildebrand Ave. between San Antonio River and Broadway St.

  • The two northern lanes (closest to University of the Incarnate Word) will be closed
  • AT&T will continue working on their underground facilities during nighttime operations

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be closed
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Broadway between Hildebrand Ave. and Burr Rd

  • The two southbound lanes (closest to University of the Incarnate Word) will be closed
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • AT&T will continue working on their underground facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be closed
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

May

Monday May 27, 2013
  • No work Scheduled (Memorial Day)
Tuesday May 28, 2013 - Saturday June 1, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center or north side
  • Continue construction of the SAWS sanitary sewer line
  • Continue construction of the CPS electrical/telecommunication along AT&T

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • The rain events experienced in April and May have affected this work

Broadway between Hildebrand Ave. and Burr Rd

  • The two southbound lanes (closest to University of the Incarnate Word) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Complete construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • The rain events experienced in April and May have affected this work

Broadway at Allensworth

  • Single lane restrictions during daytime hours
  • Continue Construction of permanent traffic signal
Sunday June 2, 2013:
  • No work Scheduled

Monday May 13, 2013- Saturday May 18, 2013:

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Begin construction of the SAWS sanitary sewer line

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities

Broadway between Hildebrand Ave. and Burr Rd

  • The two southbound lanes (closest to University of the Incarnate Word) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Complete construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities

Broadway at Allensworth

  • Single lane restrictions during daytime hours
  • Continue Construction of permanent traffic signal
Sunday May 19, 2013:
  • No work scheduled

Monday May 6, 2013- Saturday May 11, 2013:

Hildebrand Ave. between San Antonio River and Broadway St.

  • The two northern lanes (closest to University of the Incarnate Word) will be closed
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be closed
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Broadway between Hildebrand Ave. and Burr Rd

  • The two southbound lanes (closest to University of the Incarnate Word) will be closed
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be closed
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities to include night time operations
Sunday May 12, 2013:
  • No work scheduled

Sunday May 5, 2013:
  • No work scheduled
Monday May 20, 2013- Saturday May 25, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Continue construction of the SAWS sanitary sewer line
  • Continue construction of the CPS electrical/telecommunication along AT&T

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • The rain events experienced in April and May have affected this work

Broadway between Hildebrand Ave. and Burr Rd.

  • The two southbound lanes (closest to University of the Incarnate Word) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Complete construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction and two lanes in the southbound direction will remain open
  • Contine Construction of CPS electrical/telecommunication duct bank facilities
  • The rain events experienced in April and May have affected this work

Broadway at Allensworth

  • Single lane restrictions during daytime hours
  • Continue Construction of permanent traffic signal
Sunday May 26, 2013:
  • No work scheduled

June

Friday June 14, 2013 & Monday June 17, 2013

Broadway between Perry Ct. and Burr Rd.

  • Between the hours of 9:00PM to 2:00AM the two western northbound lanes will be restricted (closest to the center)
  • The northbound lane closest to Bill Miller will remain open
  • SAWS will be performing maintenance work on the existing water main
  • This work is not related to the Broadway-Hildebrand construction project

Project Work Schedule: Monday June 17 - Sunday June 23

Monday June 17, 2013 - Saturday June 22, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Continue construction of the SAWS sanitary sewer line
  • Continue construction of the CPS electrical/telecommunication along AT&T

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • Recent rain events have affected the completion of this work

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • Recent rain events continue to affect the completion of this work
Sunday June 23, 2013
  • No work Scheduled

Monday June 10, 2013 - Saturday June 15, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Continue construction of the SAWS sanitary sewer line
  • Continue construction of the CPS electrical/telecommunication along AT&T

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Continue Construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
  • Recent rain events have affected the completion of this work

Broadway at Allensworth

  • Single lane restrictions during daytime hours
  • Continue Construction of permanent traffic signal
Sunday June 16, 2013:
  • No work Scheduled

July


Monday July 15, 2013 - Saturday July 20, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Continue construction of the SAWS sanitary sewer line

HILDEBRAND AVE. BETWEEN BROADWAY ST. AND NEW BRAUNFELS AVE.

  • southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Complete Construction of CPS electrical/telecommunication duct bank facilities

BROADWAY BETWEEN GROVELAND PL. AND HILDEBRAND AVE.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction will remain open
  • Southbound traffic will be shifted east; one lane will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
MONDAY JULY 15, 2013

BROADWAY BETWEEN HILDEBRAND AND BURR

  • Between 9am and 3pm the eastern lane (closest to the Wash Tub) will be restricted
  • Traffic will be shifted west; two lanes to maintain two lanes in the northbound direction
  • AT&T will be working on their overhead facilities
SUNDAY JULY 21, 2013
  • No work Scheduled
                                                                                                                                            
Monday July 1, 2013 - Saturday July 6, 2013

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center
  • Continue construction of the SAWS sanitary sewer line

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Complete Construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two northbound lanes (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted west; two lanes in the northbound direction will remain open
  • Southbound traffic will be shifted east; one lane will remain open
  • Continue Construction of CPS electrical/telecommunication duct bank facilities
Thursday July 4, 2013
  • No work Scheduled
Sunday July 7, 2013
  • No work Scheduled


August

SPECIAL NOTICE - INTERSECTION CLOSURE

FRIDAY AUGUST 9 AT 9P.M. - MONDAY AUGUST 12 AT 5A.M.

INTERSECTION OF HILDEBRAND AVE.  AND BROADWAY ST. WILL BE CLOSED

  • Install utility facilities across the intersection
  • Detours will be in place

PROJECT WORK SCHEDULE: MONDAY AUGUST 5- SUNDAY AUGUST 11

HILDEBRAND AVE. BETWEEN SAN ANTONIO RIVER AND BROADWAY ST.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center and/or the south
  • Continue construction of the SAWS sanitary sewer line

HILDEBRAND AVE. BETWEEN BROADWAY ST. AND NEW BRAUNFELS AVE.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Complete construction of CPS electrical/telecommunication duct bank facilities

BROADWAY BETWEEN GROVELAND PL. AND HILDEBRAND AVE.

  • The two southbound lanes (closest to AT&T) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities

Special notice - Intersection closure

friDAY august 9 at 9p.m. - monDAY AUGUST 12 at 5a.m.

intersection of HILDEBRAND AVE.  AND BROADWAY ST. will be closed

  • Install utility facilities across the intersection
  • Detours will be in place

Project Work Schedule: monday august 12- Sunday AUGUST 18

Hildebrand Ave. between San Antonio River and Broadway St.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center and/or the south
  • Continue construction of the SAWS sanitary sewer line

Hildebrand Ave. between Broadway St. and New Braunfels Ave.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Complete construction of CPS electrical/telecommunication duct bank facilities

Broadway between Groveland Pl. and Hildebrand Ave.

  • The two southbound lanes (closest to AT&T) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities

SPECIAL NOTICE

MONDAY AUGUST 19 - FRIDAY AUGUST 23

MULBERRY BETWEEN ST. MARY'S AND HIGHWAY 281

  • Traffic lane restrictions
  • The Department of Public Works will be repaving Mulberry
  • This work is not related to the Broadway-Hildebrand Project

PROJECT WORK SCHEDULE: MONDAY AUGUST 19- SUNDAY AUGUST 25

HILDEBRAND AVE. BETWEEN SAN ANTONIO RIVER AND BROADWAY ST.

  • The northern lane (closest to University of the Incarnate Word) will be restricted
  • The southern lane (closest to AT&T) will be restricted
  • Traffic will be shifted to the center and/or the south
  • Construct headwall for the storm sewer outfall at the San Antonio River

HILDEBRAND AVE. BETWEEN BROADWAY ST. AND NEW BRAUNFELS AVE.

  • The southern side of Hildebrand (closest to the Broadway Condos) will be restricted
  • Traffic will be shifted to the north side
  • Begin utility conversion from overhead wires to underground

BROADWAY BETWEEN GROVELAND PL. AND HILDEBRAND AVE.

  • The two southbound lanes (closest to AT&T) will be restricted
  • Traffic will be shifted east; two lanes in the northbound direction and the southbound direction will remain open
  • Continue construction of CPS electrical/telecommunication duct bank facilities