Hardberger Park Land Bridge

Office

  • Physical Address
  • Municipal Plaza Building
    114 W. Commerce, 6th Floor
    San Antonio, TX 78205   
  • Mailing Address
  • P.O. Box 839966
    San Antonio, TX 78283-3966
  • Phone
  • 210.207.8022

Staff

  • Razi Hosseini, P.E.
    Director/City Engineer
  • Anthony Chukwudolue, P.E.
    Deputy Director
  • Christie Chapman
    Assistant Director
  • Nefi Garza, P.E.
    Assistant Director
  • Luis Maltos, P.E.
    Assistant Director
  • Paul Berry
    Chief Communications Officer

Hardberger Park Land Bridge

work update for December 2020

Completed Work

  • All weathered steel walls installed

  • Installation of limestone walls and miscellaneous site walls throughout project

  • Wildlife blind structures and installation of Public Art panel


Upcoming Work

  • Complete construction of the Skywalk

  • Complete construction of irrigation system and landscaping

  • Complete construction of lighting fixtures and cobblestone under the bridge

  • Install the Robert L.B. Tobin Land Bridge naming sign


Landscaping and trails on bridge


Landscaping and trails on bridge


Construction of skywalk tie-in to Land Bridge


Wildlife blinds


Wildlife blinds


Land Bridge design rendering

The Hardberger Park Land Bridge project is part of the voter-approved 2017-2022 Bond Program. This project is the City’s contribution to a public-private partnership with the Hardberger Park Conservancy. Currently, the Conservancy, with oversight from the City, is managing the design of the bridge and the City will oversee the Construction. Rialto Studio is the lead Architect, overseeing a full design team.

The Hardberger Park Land Bridge project provides additional development of the park based on the approved master plan. The land bridge will span Wurzbach Parkway, connecting Hardberger Park East and Hardberger Park West.

Additional improvements will include a walking trail, a limestone retaining wall, and newly planted trees and grasses.

Public Meeting reports

Public meeting on January 23, 2018

Project Map

Hardberger Park Satellite Map

Bridge Rendering

Land Bridge aerial rendering

 

 

Land Bridge Satellite rendering

construction SCHEDULE
  • Design complete February 2018
  • Project open for bids March 2018
  • Construction starts November 2018
  • Construction ends April 2020

 

BUDGET/FUNDING SOURCES

$13 Million (2017 – 2022 Bond Program)
$10M (Private and Grant Funds)

Contact Us About the Hardberger Park Land Bridge Project

Katy Otto
City of San Antonio
210.207.7167

Sign up for emails about the Hardberger Park Land Bridge Project

Sign up to get project updates and emergency news directly to your email.

Enter Email Address Go