Storm Water Plan Review

Office

  • Physical Address
  • Municipal Plaza Building
    114 W. Commerce, 6th Floor
    San Antonio, TX 78205   
  • Mailing Address
  • P.O. Box 839966
    San Antonio, TX 78283-3966
  • Phone
  • 210.207.8022

Staff

  • Razi Hosseini, P.E.
    Director/City Engineer
  • Anthony Chukwudolue, P.E.
    Deputy Director
  • Christie Chapman
    Assistant Director
  • Nefi Garza, P.E.
    Assistant Director
  • Luis Maltos, P.E.
    Interim Assistant Director
  • Paul Berry
    Chief Communications Officer

Transportation & Capital Improvements reviews storm water development plans to ensure future construction projects do not adversely impact current drainage systems. Some of the items we review include Storm Water Management Plans, major and minor plats, construction plans, Conditional Letter of Map Revisions (CLOMR), Letter of Map Revisions (LOMR), Master Development Plans (MDP), and building permits.

Information at your Fingertips

Regional Storm Water Management Program (RSWMP)

Regional Storm Water Management Program (RSWMP)
Effort to protect public health and safety by requiring development to mitigate increases in storm water runoff resulting from their development. View Storm Water Management Program.


Storm Water Design Criteria Manual
Atlas 14, Volume 11- Amendment to Storm Water Design Criteria Manual
Re-Submittal Form (DOC)
Detention Pond Plan Conformance Form (IB 553) (PDF)
Development Services Department
Mandatory Detention Area (PDF)

Connect with the

Public Works Department



Featured Items
Title VI

Title VI nondiscrimination information More

Disability Access Office

ADA and accessibility ...More